Pikangikum
Teacher Housing
Five turn-key homes — two 2-bedroom and three 1-bedroom / studio — built in 90 days at the Thunder Bay yard and shipped up the winter ice road for Pikangikum Education Authority staff.
Five homes, fully finished in our Thunder Bay factory and delivered on a tight winter-road window. Inspected, sealed, and ready to be occupied the day they land on their foundations.
Set on site, ready for winter.
Finished in the factory, occupied on arrival.
Kitchens, baths and bedrooms are fully built out at the Thunder Bay yard. The only thing left for site is hooking up power and water.
- FloorsLVT throughout
- HeatForced air, electric backup
- InsulationR-28 walls / R-50 ceiling
90 days, factory to foundation.
Factory build
Framed, clad, and equipped indoors at the Thunder Bay yard.All five units are framed, clad, finished and equipped at the Thunder Bay yard, indoors and out of the weather.
Inspection & QA
Plumbing, electrical, envelope — signed off before leaving the yard.Each unit is inspected and signed off before it leaves the yard — plumbing, electrical, envelope, and finishes.
Winter-road convoy
Loaded on step-decks and convoyed up the seasonal ice road.Modules are loaded onto step-decks and convoyed up the seasonal ice road on the schedule that the road allows.
Set on site
Set on foundations — finished homes from day one.Units land on prepared foundations and are sequenced into place — finished homes from day one.