Consult

Direct conversation about your site, budget, and timeline. Access, zoning, utilities, and constraints get mapped before any drawing begins — so the rest of the project stands on real ground.


From site to keys, in six stages.
- 01WEEKS 1–2
Consult
STAGE 01ACTIVEDirect conversation about your site, budget, and timeline. Access, zoning, utilities, and constraints get mapped before any drawing begins — so the rest of the project stands on real ground.
01Site assessment02Budget alignment03Scope of workGET IN TOUCH - 02WEEKS 3–8
Design
STAGE 02ACTIVELayouts, elevations, engineering, and material selections finalized together. Clients sign off on confirmed drawings — no mid-build surprises, no open questions heading into production.
01Architectural drawings02Engineering03Permit submissionEXPLORE THE MODELS - 03WEEKS 8–10
Plan
STAGE 03ACTIVEFactory sequencing, trade schedules, procurement, and delivery logistics are confirmed before the first cut. Pre-planning is where modular earns its timeline promise — every piece shows up the day it's needed.
01Production schedule02Procurement03LogisticsABOUT MODBOX - 04WEEKS 10–22
Fabricate
STAGE 04ACTIVEModules built indoors in our 25,000 sq ft Thunder Bay facility. Climate-controlled conditions mean tighter tolerances, consistent quality, and a schedule that doesn't slip with the weather.
01Framing02Mechanical03Interior finishingABOUT MODBOX - 05WEEK 23
Deliver
STAGE 05ACTIVETransport routes, craning logistics, and foundation readiness coordinated as one operation. Modules arrive in sequence and are set on prepared foundations — typically a single-day event.
01Transport02Crane set03Weather-tightSEE PROJECTS - 06WEEKS 24–26
Complete
STAGE 06ACTIVEFinal utility connections, interior finishing, inspections, and walkthrough on site. The project closes with full documentation, warranty paperwork, and keys handed over to a home that's ready to live in from day one.
01Final inspections02Walkthrough03HandoverSEE PROJECTS